Client

MPSG JV

Projet

HP Cooler A and B Replacement

emplacement

FPSO Kwame Nkrumah MV21

portée

ONSHORE SCOPE : 
Fabrication of a lifting frame (Engineering shop drawings and 3D modelling) and Fabrication – 100T without trial fit in 3 months
Fabrication of new HP Cooler Piping (Fabrication of 2,000” piping and up to 12” Sch160 with Heat Treatment and Hydrotest)

OFFSHORE SCOPE : 
Installation of lifting frame (Up to 20 offshore personnel including supervisors, riggers, welders, and fabricators – 18,000 Manhours)
Replacement of Cooler A and B (Up to 10 offshore personnel – 12,000 Manhours)

Images du projet


other projects